Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$25K
Most recent job
3mo ago
Jun 25, 2026
59 permits on record. Values are declared at filing.
Jun 25, 2026
No cost listed
Revision to pa# 2026-0414-9387 patio stair case
700 Grand View AvNoe Valleycomplete
Jun 25, 2026
No cost listed
Rerouting flue pipes in each room after repair.
700 Grand View AvNoe Valleycanceled#Plumbing
Jun 25, 2026
No cost listed
Run two wires to the panel: one for each room. add 8 electrical outlets & (1) light with sitch for each room.
700 Grand View AvNoe Valleycomplete#Electrical
Apr 14, 2026
$16K
Add a separation wall to divided (e) bedroom into 2 bedrooms to include (n) electrical outlets, 2 doors, patio door, and 3 windows in kind visible from street. vinyl windows. visible from the street.
700 Grand View AvNoe Valleycomplete#Windows
Jun 25, 2025
No cost listed
Electric ductless heat pump- mini split unit
237 Rolph StExcelsiorcomplete#Heating & cooling
Mar 24, 2025
No cost listed
1 dryer exhaust with duck work.
2308 Bryant StMissionexpired#Plumbing
Mar 24, 2025
No cost listed
New bathroom/laudnry room and new lighting and receptacles for living dining room at 2nd unit 3/f. 8 lights, 8 switches, 10-12 recepatcles, 2 fans.
2308 Bryant StMissioncomplete#Electrical
Mar 24, 2025
No cost listed
New bathroom with shower, new washer and dryer. shower pan inspection.
2308 Bryant StMissioncomplete#Bathroom remodel#Plumbing
Mar 17, 2025
$28K
Revision to 202102094334 (unit legalization): shift rear deck/stair 12" west, new slab to replace (e) achieve 7'8" height for entire unit. breezeway foundation rev. heating rev to electric ductless heat pump (instead of gas)
237 Rolph StExcelsiorcomplete#Foundation#Heating & cooling#Decks & stairs
Oct 24, 2024
$30K
To comply with nov 202429581 item# 1-5: unit 101: emergency bathroom remodel to repair water damage. remove of existing bathtub, toilet and sink and in kind. reinstall them at same location. replace tub with shower in same location
1308 Pacific AvRussian Hillissued#Bathroom remodel
Oct 24, 2024
No cost listed
To comply w/ nov #202429581 2nd floor: bahtroom remodel by new gfci, lights, and new fan (in kind)
1308 Pacific AvRussian Hillcomplete#Electrical
Oct 24, 2024
No cost listed
In kind bathroom repair/emergency bthroom remodel to repair water damage. emoval of existing bathrub, toilet and sink. reinstall them at same location to comply with nov202429581 - replace tub w/ shower @ same location.
1308 Pacific AvRussian Hillcomplete#Bathroom remodel#Plumbing
Sep 18, 2024
No cost listed
Existing bathroom and existing kitchen at 1/f to verify that (e) bathroom and kitchen comply with city code. install washer and dryer and tankless water heater. underground plumbing.
237 Rolph StExcelsiorcomplete#Bathroom remodel#Plumbing#Water heater
Sep 18, 2024
No cost listed
Legalize adu unit on 1/f: 2 bedrooms, 1 bath, 1 kitchen, and home office laundry and mechanical room. 3-0 feeder, 1 subpanel 200 amp. 8 circuits, 20 lights, 10 switches, 20 receptacles, 1 fan, 1 g/d, 1 microwave, 1 range, 5 s/d fridge.
237 Rolph StExcelsiorcomplete#Electrical
Sep 18, 2024
No cost listed
Install new furnace for adu unit. new bathroom fan. new tankless water heater. exhaust line for kitchen hood. exhaust fan for dryer.
237 Rolph StExcelsiorexpired#Bathroom remodel#Water heater#Heating & cooling
Jul 31, 2024
$120K
Addition of new 3rd floor balcony, new rear exterior doors,replace windows and front entry gate (same location), addition of exterior trim at front facade. select interior work within building envelope at 3rd floor (unit #2) to include remodel of rear area, bathroom and new laundry.
2308 Bryant StMissioncomplete#Windows#Bathroom remodel#Decks & stairs#Siding & facade
Jul 8, 2024
No cost listed
At existing bathroom replace existing sink and toilet in kind replacement.
210 02nd AvInner Richmondcomplete#Bathroom remodel#Plumbing
Jul 3, 2024
No cost listed
Move (e) light switch to a side wall & (e) bathroom and install rnc gfci at existing bathroom.
210 02nd AvInner Richmondcomplete#Electrical
Jun 12, 2024
No cost listed
Install new furance for adu unit. new bathroom fan, new tankless water heater, exhaust line for kitchen hood.
706 Huron AvOuter Missioncomplete#Bathroom remodel#Water heater
May 2, 2024
No cost listed
New bathroom and kitchen at first floor as per approved pa# 202201115776. repair existing waste lines for bathroom and kitchen at 2/f. fabracated shower pan and underground work.
706 Huron AvOuter Missioncomplete#Bathroom remodel#Plumbing