Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$15.6K
Most recent job
8.0y ago
Oct 24, 2018
8 permits on record. Values are declared at filing.
Oct 24, 2018
$21K
Volatary strengtheing, add 40 simpson, ulfp sds3 to existing mudslide crawl space every 3'0 , add 1/2" struct 1 cdx. plywood to existing criddle walls in basement, add 3by 4 studs where needed for nailing. use 6-12 patch.
350 Page StHayes Valleycomplete
Jan 17, 2018
$28K
Insulate front, rear, and right side perimter walls with woodrock insulation. add 5/8 anchor bolts with simpson set xp epoxy every 4 ft with 7" embedment to left, rear and 20 ft of right wall, add 1/2" osb struct 1 to left, rear and 10 ft of right side wall. 10d common at 6" e.n, 12" field.
155 Moffitt StGlen Parkcomplete
Jan 17, 2018
$8.4K
Brace & bolt, add 5/8 anchor bolts with simpson set xp epoxy every 4 ft with 7" embedment to left, rear and 20 ft of right wall, add 1/2" osb struct 1 to left, rear and 10 ft of right side wall. 10d common at 6" e.n, 12" field.
4 Ord CtCastro/Upper Marketcomplete
Nov 14, 2017
No cost listed
Revision to permit #2017-0830-6459; #2017-0830-6461. rear and front foundation revision, new furring wall at front facade. n/a ordinance #155-13
929 Fell StHayes Valleycomplete
Nov 14, 2017
No cost listed
Revision to permit #2017-0830-6459; #2017-0830-6461. rear and front foundation revision, new furring wall at front facade. n/a ordinance #155-13
925 Fell StHayes Valleycomplete
Aug 30, 2017
$72.8K
Soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4
929 Fell StHayes Valleycomplete#Seismic retrofit
Jul 21, 2017
$10.2K
Voluntary strengthening , add 5/8 anchor bolts every 4 ft with 7" embedment with epoxy.add 4d linear ft of osb struct 1, plywood, add 6" sos screw at top plate & rim joist where plywood is installed.
159 Monterey BlWest of Twin Peakscomplete
Mar 10, 2017
$10K
Remove panel board in family room. add r-13 insulation and 5/8 drywall. change door to pocket door to (e) bathroom. replace door to garage and door to deck. not visible from street.
203 Holly Park CrBernal Heightsissued#Bathroom remodel#Decks & stairs