Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
1mo ago
Sep 8, 2026
84 permits on record. Values are declared at filing.
Sep 8, 2026
No cost listed
Work category: 2pa; final inspection for four bathrooms powder room kitchen two laundry rooms new electric heat pump water heater
230 Cherry StPresidio Heightscomplete
Aug 19, 2026
No cost listed
Work category: 2pa; final inspection for: two bathrooms. powder room. laundry and kitchen
4073 26th StNoe Valleycomplete
Aug 14, 2026
No cost listed
Work category: 2pa; installation of two shower pans
4172 23rd StNoe Valleycomplete#Bathroom remodel#Plumbing
Jul 17, 2026
No cost listed
Work category: 1p; correction notice for existing bathroom! installation of new shower drain (minor work, correction notice). the inspection and revision of the rough in plumbing prior is needed, the work is existing, it only needs to be rectified if everything is well installed, (sink, shower valve and toilet) trim out plumbing installation of new sink installation of new toilet installation of nes shower valve trim
3110 California StPresidio Heightscomplete#Bathroom remodel#Plumbing
Jun 9, 2026
No cost listed
Work category: 2pb; unit 2065: two new bathrooms, new kitchen, new laundry and new tankless water heater, new gas lines. unit 2067: two new bathrooms, new kitchen, new laundry and new tankless water heater, new gas lines. unit 2069: two new bathrooms, new kitchen, new laundry and new tankless water heater, new gas lines. new water main for three units.
2065 Ofarrell StWestern Additioncomplete#Bathroom remodel#Plumbing#Water heater
May 26, 2026
No cost listed
Work category: 2pa; bathroom: new sink, new wall-mount toilet and new shower. kitchen: new kitchen sink and dishwasher. gas: relocation of new gas valve for stove and dryer.
300 Valley StNoe Valleyissued#Bathroom remodel#Plumbing
May 19, 2026
No cost listed
Work category: 2pb; storm drains: -patio drain, gutter drain, small trench drain, light well drain. two bathrooms, one laundry and one bar sink. connection of second floor drains from kitchen and bathroom. installation of new heat pump electric water heater. radiant heating provide and installation of radiant heating system for 2600sf including piping, heating components, boiler, flue vents.
711 Hampshire StMissionissued#Bathroom remodel#Plumbing#Water heater#Heating & cooling
May 19, 2026
No cost listed
Work category: 2pb; new sewer line. new storm line. two new house traps. new water main.
711 Hampshire StMissionissued#Plumbing
Apr 28, 2026
No cost listed
Work category: 2pa; basement: new heat pump water heater and water filter system. second floor: guest bathroom ( sink, wallmount toilet, shower and bathtub), master bathroom: ( wall mount toilet, double sink and existing shower) and laundry room. third floor: bathroom ( sink, wall mount toilet and shower) and bar sink. two roof drains. two shower pans installation.
116 Delmar StHaight Ashburyissued#Bathroom remodel#Plumbing#Water heater
Apr 13, 2026
No cost listed
Work category: 2pa; 160 noe st: two new bathrooms, new kitchen and new laundry. 162 noe st: two new bathrooms, new kitchen and new laundry. final inspection only. underground and roof plumbing was approved before like year ago.
160 Noe StCastro/Upper Marketcomplete
Apr 8, 2026
No cost listed
Work category: 1p; kitchen remodel.
214 Hoffman AvNoe Valleycomplete#Plumbing
Mar 27, 2026
No cost listed
Work category: 2pa; -provide an installation of 3600sf of thermal board of radiation heating system. -installation of new electronic heat pump (space pak system) in mechanical room ( first floor location and roof location) -installation of all components and thermostats for 6 zones.
116 Delmar StHaight Ashburyissued#Heating & cooling
Mar 23, 2026
No cost listed
Work category: 2pb; bathroom remodel -toilet -double sink -bathtub. new sewer lateral
2667 22nd AvSunset/Parksideissued#Bathroom remodel#Plumbing
Mar 11, 2026
No cost listed
Work category: 2pa; new kitchen. new laundry room. new light well drain. new 2" downspouts drain for existing roof drain.
361 Upper TrHaight Ashburycomplete#Plumbing
Feb 19, 2026
No cost listed
Work category: 2pb; installation of: 2) dump sinks 2) floor sinks 1) hand sink 1) 3 compartment sink 1) floor drain
2500 Mission StMissionissued#Plumbing
Feb 10, 2026
No cost listed
Work category: 1p; new shower drain, new shower valve. new sink drain (small work) new toilet ( toilet flange replacement and small vent section)
2041 Vallejo StPacific Heightscomplete#Bathroom remodel#Plumbing
Jan 21, 2026
No cost listed
Work category: 2pa; -bathroom: new sink, toilet, bathtub and shower valve. -primary bath: new double sink, toilet, shower drain, shower valve and bathtub with floor mount faucet. -new laundry room
818 43rd AvOuter Richmondcomplete#Bathroom remodel#Plumbing
Jan 15, 2026
No cost listed
Work category: 2pb; -house trap and small sewer line replacement.
534 Mangels AvWest of Twin Peakscomplete#Plumbing
Dec 8, 2025
No cost listed
Work category: 2pb; new bathroom: sink, toilet and walking shower. new kitchen. new sewer line and house trap
1351 Douglass StNoe Valleycomplete#Bathroom remodel#Plumbing
Dec 8, 2025
No cost listed
Work category: 2pa; 3158 clay st: new floor drain ( elevator location) 3160 clay st: bathroom #1: double sink, toilet and shower. bathroom #2: sink, toilet and shower. bathroom #3: sink, toilet and shower. powder room: sink and toilet. laundry room. new kitchen. new deck: new roof drain and hose bibb. new gas supply. new tankless water heater. 3156 clay st: new powder room. laundry and master bathroom. new shower pans. new tankless water heaters
3160 Clay StPacific Heightsissued#Bathroom remodel#Plumbing#Water heater