Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
4mo ago
Jun 12, 2026
15 permits on record. Values are declared at filing.
Jun 12, 2026
No cost listed
Plumbing underground waste piping. ref#: 202603278446
1450 Owens StMission Bayissued#Plumbing
Jun 12, 2026
No cost listed
Install new break sink at 5th floor. pa#: 202512111608
345 Spear StFinancial District/South Beachcomplete#Plumbing
May 26, 2026
No cost listed
Demo (e) boiler: teledyne laars, hh0175cn12cbacx, 92110158c. will no be re-used. update 8/21/2026: two removed boilers, teledyne laars tl80-199ns, were s/n d99cn0065 and d99cn0064. not as listed on description. ky
345 Spear StFinancial District/South Beachcomplete#Heating & cooling
Apr 24, 2026
No cost listed
Demo of (2) existing back flow preventors and cap the lines.
345 Spear StFinancial District/South Beachissued#Plumbing
Mar 3, 2026
No cost listed
New sewer and vent piping, new domestic cold water and domestic hot water piping, new storm drain piping and new plumbing systems.
449 Avenue HTreasure Islandissued#Plumbing
Feb 1, 2026
No cost listed
Demo (1) condensing unit (co-1) and (3) fan coil units (fcu-1, fcu-2, fcu-3)
680 Folsom StFinancial District/South Beachissued#Plumbing
Jan 22, 2025
No cost listed
Pier 1 install 2 ton ductless mini split within the same opening in kind
0 Pier 1Financial District/South Beachissued#Heating & cooling#Electrical
Jan 22, 2025
No cost listed
Pier 1- install mini split system within the same opening in kind
0 Pier 1Financial District/South Beachcomplete#Heating & cooling
Dec 17, 2024
No cost listed
Replace 2 boilers located in penthouse. serial number old 73403 and 73402. new boiler sn 072497248 and 072497316
701 Mission StFinancial District/South Beachcomplete#Heating & cooling
Sep 18, 2023
No cost listed
Work category: 5m; warm shell vrf with future stub-ins for tenant improvement. central dedicate outside air unit with back of house vrf fcu cooling/heating.
300 Kansas StMission Baycomplete#Heating & cooling
Sep 7, 2023
No cost listed
Demo (12) water closets, (12) laboratories (3)urinals, 2 ada showers. demo safe off and flag for removal of any piping taht needs to be capped back to mains. replace (11) water closets, (10) laboratories and (3) urnials, (3) new water closets, laboratories, (1) engineering office sink w/facet, (1) 1/2 inch water supply for grab amd gp amd ada showers
550 Terry A Francois BlMission Baycomplete#Bathroom remodel#Plumbing
Sep 7, 2023
No cost listed
Lab side, glaswash room 1062, toilet room 1055, toilet room 1056, procssing piping, coffee bar 1014, toilet room 1026, break room 1030
550 Terry A Francois BlMission Bayexpired#Plumbing
Sep 7, 2023
No cost listed
New (2)sample port (1) 4" duplex sewage ejector system (1) new 3" rw service. (3) flextends for settelments (1) new domestic booster skid (5) lab waste and vents (4) sanitory waste/vents (1) 3" dcw riser for tenant space w/2" on every level (1) new 3" dcw prv (1) 3" 3" cw connection to new booster roof to gas to all equipment. drains to all roof top equipment.
550 Terry A Francois BlMission Baycomplete#Plumbing
Aug 2, 2023
No cost listed
Backflow preventor demo permit. (1) demo backflow in mechanical room next to cafeteria. (1) demo and replace -roof cooling tower west penthouse (1) demo and replace - roof entrance 45 boiler room.
550 Terry A Francois BlMission Baycomplete#Plumbing#Heating & cooling
Jul 26, 2022
No cost listed
Level 3: install hvac pipe installation for single floor t.i. of an office space. refigerant pipe and chilled water pipe.
360 Spear StFinancial District/South Beachcomplete#Heating & cooling