Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$85K
Most recent job
2.7y ago
Feb 12, 2024
12 permits on record. Values are declared at filing.
Feb 12, 2024
$50K
Repair 2 extg rear decks (less than 50%). replace exterior siding at front and rear. replace 8 wndows and 6 sliding doors.
991 Duncan StNoe Valleycomplete#Decks & stairs#Siding & facade
Aug 30, 2023
$10K
Shoring plan, added to pa# 201806071297s
535 Fell StHayes Valleyissued
Jul 6, 2023
$85K
To comply w/ 202290459 & 202292608 repair (e) foundation
25 Alta StNorth Beachwithdrawn#Foundation
Jun 30, 2021
$65K
Revision to previous pa# 201610261228 & 201909272891. elevation of a new storage room at the basement level. no lateral or vertical expansion beyond the previously approved foot print. work in area "4" only on a1.0.
2622 Greenwich StMarinacomplete#Plumbing
Mar 15, 2021
No cost listed
Unit b: kitchen and bathroom renovation: add washer and dryer, replace bath tub and toilet.
3356 Cesar Chavez StMissioncomplete#Bathroom remodel#Plumbing
Mar 15, 2021
No cost listed
Unit b: kitchen and bathroom remodel: upgrade and bring to code 20 outlets, new panel, garbage disposal, dishwasher and range.
3356 Cesar Chavez StMissioncomplete#Electrical
Mar 3, 2021
$36K
#b. kitchen remodel - replace sink, faucet, hood, cabinets and counter top. upgrade all plumbing & electricla to meet code. bathroom remodel - replace tub, toilet, cabinet. upgrade all plumbing & electrical. paint entire unit, new drywall.
3356 Cesar Chavez StMissioncomplete#Kitchen remodel#Bathroom remodel#Plumbing
Feb 18, 2020
No cost listed
Alter site permit to 2014-0106-5657s w/ increased elevator penthouse size.**maher n/a**
2146 03rd StPotrero Hillcancelled
Dec 6, 2018
$690K
Horizontal & vertical addition @ rear of the property. (3) new bedrooms @ 3rd flr addition.
52 Pond StCastro/Upper Marketcomplete#Additions & major remodels
Nov 26, 2018
$150K
Temporary shoring incl concrete, reinforcing steel, welding
327 Park StBernal Heightscomplete
Jun 7, 2018
$1.1M
Interior remodel, expansion of living space into basement, and 3rd story addition including full seismic upgrade per sfebc 403.13. (construction type upgraded to type v-a)
535 Fell StHayes Valleyissued#Seismic retrofit
Jun 14, 2017
$1.2M
Renovation of (e) 3-unit multi-family bldg w/ 1-car garage. (n) addition consists of (1)(n) level 1-car stacker for (2) cars, (2) units comprising (2)bed/(2)bath each. (1) unit comprising of (3) bed/(1) rec room/(2.5)bath, (n) design/build. sprinkler system per nfpa-13r.
453 Buena Vista East AvCastro/Upper Marketcomplete#Bathroom remodel#Fire sprinklers & alarms