Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$10K
Most recent job
5.4y ago
Jun 3, 2021
28 permits on record. Values are declared at filing.
Jun 3, 2021
No cost listed
Rev to pa202010317907: additional structural detail for (e) construction of stairs in the existing lightwell.
2115 18th AvWest of Twin Peakscomplete
Apr 14, 2021
No cost listed
Install electrical outlets, lighting and switches for 1st floor media room and new bathroom using existing panel.
2115 18th AvWest of Twin Peakscomplete#Electrical
Apr 14, 2021
No cost listed
Construct media room with one new bath and relocate existing laundry to new location.
2115 18th AvWest of Twin Peakscomplete#Bathroom remodel#Plumbing
Apr 14, 2021
No cost listed
Install electrical outlets, lighting and switches for 1st floor media room and new bathrrom using existing panel.
2115 18th AvWest of Twin Peaksfiled#Electrical
Oct 31, 2020
$56K
Add new bathroom to existing bonue room on 1st floor. convert (e) bonus room to (n) media room (350 sqft babitable space) on 1st floor.
2115 18th AvWest of Twin Peakscomplete#Bathroom remodel
Feb 10, 2020
No cost listed
Revision to pa 2019-1017-4751 revise horizontal siding to be replaced inkind with vertical wood siding @ lower front facade. all others no change. shall follow previous approved plan. reinstall mailbox
410 Austin StPacific Heightscomplete
Dec 19, 2019
$35K
Remodel (2) (e) bathrooms in kind. add laundry @ (e) hall closet at top floor. provide w/ 100 sq in make-up air and exhaust per cmc 52.2.1 & 504.4
446 Collingwood StNoe Valleyissued#Bathroom remodel
Dec 18, 2019
No cost listed
Install new subpanel for (4) new designated circuits, (1) for dryer, (2) for two bathrooms gfci, (1) for lighting.
446 Collingwood StNoe Valleycomplete#Electrical
Dec 18, 2019
No cost listed
Remodel (2) bathrooms, add laundry to existing closet. one shower pan
446 Collingwood StNoe Valleycomplete#Bathroom remodel#Plumbing
Oct 17, 2019
$5K
Ref pa# 201906133373; replace (e) stair to meet current code, repair ground fl dryrot at front wall, and replace siding, replace 2nd fl. guard rail at front to meet current code
410 Austin StPacific Heightscomplete#Siding & facade
Sep 12, 2019
$7K
Replace existing siding at property line in kind (244 duncan side) appx 350 sqft
250 Duncan StNoe Valleycomplete#Siding & facade
Jul 30, 2019
$37K
Revision to pa #201904258917. renovate existing 2nd fl bathroom in kind, replace insulation, replace drywall for 75% of bldg. replace siding at rear of building. replace rear deck-in kind.
244 Duncan StNoe Valleyissued
Jun 13, 2019
$10K
Remove and replace dry rot at front of building, landing boards and exterior siding to be replaced in kind - no changes to front of property at street level.
410 Austin StPacific Heightscomplete#Siding & facade
May 16, 2019
$10K
Window restoration at front of bldg w/marvin aluminum clad, double hung, windows, redo sigin, add transom @ door & change trim
244 Duncan StNoe Valleycomplete#Windows
May 1, 2019
No cost listed
Renovate existing kitchen & bath in kind. relocate laundry.
244 Duncan StNoe Valleycomplete#Bathroom remodel#Plumbing
May 1, 2019
No cost listed
Install new light fixtures and outlets & circuits for whole house remodel including one bath and kitchen.
244 Duncan StNoe Valleycomplete#Electrical
Apr 25, 2019
$150K
Voluntary strengthening. reconfigure 1st fl/(n) bedrooms & internal stairs. renoate 2nd fl kitchen w/fixtures.
244 Duncan StNoe Valleycomplete#Kitchen remodel
Oct 11, 2018
$5K
Voluntary seismic upgrade bolt and brace
671 Ulloa StWest of Twin Peakscomplete#Seismic retrofit
Jul 24, 2018
No cost listed
Remodel of kitchen & bathroom. add (n) bathroom. install 2 shower pans. relocate gas fireplace.
75 Topaz WyGlen Parkcomplete#Bathroom remodel#Plumbing
Jul 24, 2018
No cost listed
Interior remodel: remodel (e) kitchen, bathrooms, add (n) bathroom, relocate gas fireplace (electric ignitor). new subpanel. new plugs, lights, switches.
75 Topaz WyGlen Parkcomplete#Electrical