Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$215K
Most recent job
7mo ago
Mar 3, 2026
44 permits on record. Values are declared at filing.
Mar 3, 2026
No cost listed
Pv modules 84 x550/1000 =46.2 kw. solar permit plans filed under 202205053630 add 13.
2550 Irving StSunset/Parksidecomplete#Solar & batteries
Jun 11, 2025
No cost listed
Changes to approved addenda 201910083919 - 11 s2 solar changes consisted of using 5 pv panel out of 96 of a different model/mfg, using a different pv inverter, upsizing wire and fuse size from inverter to pv ac disonnect. no change to pv system size kw-dc
151 Friedell StBayview Hunters Pointcomplete#Solar & batteries
Jun 11, 2025
No cost listed
Changes to approved addenda 201910083919 - 11 s2 solar changes consisted of using 5 pv panel out of 96 of a different model/mfg, using a different pv inverter, upsizing wire and fuse size from inverter to pv ac disonnect. no change to pv system size kw-dc
351 Friedell StBayview Hunters Pointcomplete#Solar & batteries
Apr 7, 2025
No cost listed
88 pv modules, 410 w = 36.1 kw. deferred submittal for building pa 201910083908 addenda 11.
151 Friedell StBayview Hunters Pointcomplete#Solar & batteries
Apr 7, 2025
No cost listed
96 pv modules, 410 w = 39.4kw. deferred submittal for building pa 201910083919 addenda 11.
351 Friedell StBayview Hunters Pointcomplete#Solar & batteries
Feb 26, 2025
No cost listed
Change of address from 11 innes ct to 275 coleman per inspector michael choly. ref to issued permit e20250224188.
275 Coleman StBayview Hunters Pointcomplete#Electrical
Feb 23, 2025
No cost listed
Charging for 92.4 (dc)kw. building permit reference # 202104269364-s6.
11 Innes CtBayview Hunters Pointcomplete#Electrical
Dec 9, 2024
No cost listed
Residential solar permit. 187 pv modules, 445 watts per module, 83.2 (dc) kw system. ref bpa# 202103166613s8
400 China Basin StMission Baycomplete#Solar & batteries
Jul 12, 2023
No cost listed
Pv plan#5213: 27 pv modules x 340 watts per module/1000=9.18 (dc) kw system. this app is to replace e20201207707. previous contractor abandoned the project.
224 Webster StHayes Valleycomplete#Solar & batteries
Jul 12, 2023
No cost listed
Pv plan#5212: 181 pv modules x 340 watts per module/1000=61.54 (dc) kw system. this app is to replace e20201207708. previous contractor abandoned the project.
409 Page StHayes Valleycomplete#Solar & batteries
Jul 12, 2023
No cost listed
Pv plan#5214: 107 pv modules x 340 watts per module/1000=36.38 (dc) kw system. this app is to replace e20201207706. previous contractor abandoned the project.
312 Haight StHayes Valleycomplete#Solar & batteries
May 13, 2022
No cost listed
Solar hot water heating syste. 3200sf of collector area. new development origianl address 242 hahn st
270 Malosi StVisitacion Valleycomplete#Plumbing
May 13, 2022
No cost listed
Solar hot water heating system. elecrical work consist of running a single 30a/2240v ckt for the systm controller. original address 242 hahn st - new development.
290 Malosi StVisitacion Valleycomplete#Solar & batteries
May 13, 2022
No cost listed
Solar hot water heating system. elecrical work consist of running a single 30a/2240v ckt for the systm controller. original address 242 hahn st - new development.
270 Malosi StVisitacion Valleycomplete#Solar & batteries
May 13, 2022
No cost listed
Solar hot water heating syste. 3200sf of collector area. new development origianl address 242 hahn st
290 Malosi StVisitacion Valleycomplete#Plumbing
Aug 9, 2021
No cost listed
Plan 2967. 96 pv modules, 375 / 1000 watts per module, 36 (dc) kw.
691 China Basin StMission Baycancelled#Solar & batteries
Jul 29, 2021
No cost listed
Installation of solar hot water heating system. system is part of an approved addenda schedule under 201804196918 s11.
691 China Basin StMission Baycomplete#Plumbing
Jan 27, 2021
No cost listed
Installation of the solar hot water heating system. building is presently under contruction as an affordable housing building
1990 Folsom StMissioncomplete#Plumbing
Dec 21, 2020
No cost listed
Installation of the solar hot water heating system. system has 24, 4x10 thermal collectors. total system collector area = 960 sq ft.
950 Tennessee StPotrero Hillcomplete#Plumbing
Dec 21, 2020
No cost listed
Installation of the solar hot water heating system. system has 69, 4x10 thermal collectors. total system collector area = 2760 sq ft.
188 Hooper StMission Baycomplete#Plumbing