Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
1mo ago
Sep 8, 2026
231 permits on record. Values are declared at filing.
Sep 8, 2026
No cost listed
100-200 amp main panel upgrade overhead full house rewire 125 amp feeder line installation 125 amp subpanel replacement
506 Faxon AvOceanview/Merced/Inglesideissued#Electrical
Sep 2, 2026
No cost listed
100 amp sub panel installation on upstairs hallway
308 Garfield StOceanview/Merced/Inglesidecomplete#Electrical
Aug 27, 2026
No cost listed
100-200 amp main panel upgrade overhead 125 amp feeder line replacement, running from main panel to sub 125 amp subpanel replacement, located on interior wall of garage smoke detector replacement full house rewire 50 amp ev charger installation
130 Marston AvWest of Twin Peaksissued#Electrical#EV charger
Aug 26, 2026
No cost listed
Full unit rewire. 3 bed 1 bathroom living room dining room 100 amp main disconnect installation on the garage. (removing the existing sub panel) 100 amp feeder line installation. 100 amp sub panel installation in the hallway
1742 11th AvInner Sunsetissued#Electrical
Jul 30, 2026
No cost listed
100-200 amp main panel upgrade overhead
1734 46th AvSunset/Parksideissued#Electrical
Jul 22, 2026
No cost listed
200-200 amp main panel replacement overhead
278 Juanita WyWest of Twin Peakscomplete#Electrical
Jul 20, 2026
No cost listed
100-200 amp main panel upgrade overhead, to be relocated to exterior front of home
465 Lansdale AvWest of Twin Peakscomplete#Electrical
Jul 14, 2026
No cost listed
Full house rewire 100 amp sub panel installation
1251 Jackson StNob Hillissued#Electrical
Jul 2, 2026
No cost listed
50 amp subpanel installation 50 amp feeder line installation 50 amp nema tesla ev charger installation
1 Wattson PlOuter Missionissued#Electrical#EV charger
Jul 2, 2026
No cost listed
Full house re-wire kitchen, living room, dining room, hallway, 2 bedrooms, 2 bathrooms
2065 BroadwayPacific Heightscomplete#Electrical
Jun 22, 2026
No cost listed
Full house rewire 100 amp subpanel installation
1253 Jackson StNob Hillissued#Electrical
Jun 17, 2026
No cost listed
100-200 amp main panel upgrade overhead 125 amp subpanel installation 125 amp feeder line installation 50 amp ev charger installation, to be located inside garage
2431 Ulloa StSunset/Parksideissued#Electrical#EV charger
Jun 12, 2026
No cost listed
100 - 200 amp main panel upgrade overhead located on the right wall right inside the hallway. new panel will be relocated to the front of the house. new 125 amps sub panel installation to be located where the current main panel is. 50 amps ev charger installation inside the garage. 30 amps dedicated line installation for electric dryer in the garage.
300 Edna StWest of Twin Peaksissued#Electrical#EV charger
Jun 11, 2026
No cost listed
Amendment ref to issued permit #ew202605114832. entire house rewire 70 amp main disconnect box replacement, 70 amp feeder line installation, 70 amp subpanel replacment to be relocated to hallway.
1953 Eddy StWestern Additioncomplete#Electrical
Jun 10, 2026
No cost listed
100 - 100 amp sub panel replacement located on the garage back to back with the main panel
308 Garfield StOceanview/Merced/Inglesidecomplete#Electrical
Jun 3, 2026
No cost listed
100-200 amp main panel upgrade overhead, located on interior wall of garage 32 existing recessed light replacements
465 Lansdale AvWest of Twin Peakscancelled#Electrical
May 28, 2026
No cost listed
Partial house rewire (2nd floor: kitchen, dining room, living room, family room, hallway, 3 bedrooms, and 2 bathrooms)
465 Lansdale AvWest of Twin Peakscomplete#Electrical
May 20, 2026
No cost listed
Installing baseboard heater
618 Buchanan StHayes Valleycomplete#Electrical
May 11, 2026
No cost listed
Entire house rewire 270 amp main disconnect box replacement 70a feeder line installation 70 amp sub panel replacement, to be relocated to hallway.
1953 Eddy StWestern Additionissued#Electrical
May 11, 2026
No cost listed
Entire house rewire 70 amp main disconnect box replacement 70a feeder line installation 70 amp sub panel replacement, to be relocated to hallway.
1955 Eddy StWestern Additioncomplete#Electrical