Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$35K
Most recent job
1.8y ago
Jan 16, 2025
19 permits on record. Values are declared at filing.
Jan 16, 2025
No cost listed
Install (1) power protection cabinet (ppc) install proposed power conduits (4) install (1) proposed outdoor receptacle. all work outdoors.
300 02nd AvInner Richmondcomplete#Electrical
Jan 16, 2025
No cost listed
Install (4) proposed conduits. install (1) proposed outdoor receptacle. all work outdoors.
2000 Van Ness AvRussian Hillcomplete#Electrical
Oct 17, 2024
No cost listed
Garage: electrical install of 1 nema 1450 outlet for ev
1711 Broderick StPacific Heightscomplete#Electrical
Oct 30, 2023
$50K
Dish: remove (e) antennas & equipment; install 3(n) antennas within 2(n) screen radomes; install 1(n) cabinet; install (n) electrical panel; no proposed batteries
300 02nd AvInner Richmondcomplete#Kitchen remodel#Electrical
Jun 26, 2023
$20K
Ess 27-kwh ess. tesla wall connector. electrical permit# e202106073475.
65 Normandie TrPacific Heightscomplete#Solar & batteries#EV charger
Apr 27, 2022
No cost listed
Pv plan 4434. 12 pv modules, 360 / 1000 watts per module, 4.32 (dc) kw. service upgrade.
95 Greenwood AvWest of Twin Peakscomplete#Electrical#Solar & batteries
Apr 19, 2022
No cost listed
Pv plan #3844. 34 pv modules x 380 watts / 1000 = 12.92 kw. batteries. new subpanel.
2440 14th AvWest of Twin Peakscomplete#Electrical#Solar & batteries
Jun 16, 2021
No cost listed
Pv plan 3579 install: 15 mods, 420 watts/mod, 6.30 (dc) kw system. new subpanel.
2506 46th AvSunset/Parksidecomplete#Electrical
Jun 7, 2021
No cost listed
Pv plan # 3331 , 30 x 420 / 1000 = 12.6 dc kw , new subpanel - to install a solar photovoltaic (pv) system, 30 modules , 12.6 dc kw
65 Normandie TrPacific Heightscomplete#Electrical#Solar & batteries
Jun 1, 2021
No cost listed
Pv plan # 3540 , 16 x 420 / 1000 = 6.72 dc kw , new subpanel - to install a roof mount solar photovoltaic (pv) system. 16 modules, 6.72kw
71 Farallones StOceanview/Merced/Inglesidecomplete#Electrical#Solar & batteries
May 15, 2019
No cost listed
T-mobile temporary installation of (2) antenna on the roof and cable to existing equipment, installation of (1) temporary cabinet, (1) temporary breaker
77 Beale StFinancial District/South Beachcomplete#Electrical
Feb 25, 2019
No cost listed
Address correction. ref permit ew201902128711. pg&e utility pole adjacent to 2381 41st ave, san francisco, ca 94116. main/meter service panel corroded beyond repair. pge shutoff pwer and asked for replacement of msp
999 Unknownexpired#Electrical
Feb 25, 2019
No cost listed
Temporary electrical wiring for temporary t-mobile cell site for chinese new year coverage, the wiring and cell site will be removed after the event.
5 03rd StFinancial District/South Beachcomplete#Electrical
Feb 25, 2019
No cost listed
Temporary electrical wiring for temporary unmanned t-mobile cell site for chinese new year coverage, wiring and cell site will be removed after the event
957 Grant AvChinatowncomplete#Electrical
Feb 11, 2019
No cost listed
2381 41st ave, san francisco, ca 94116 pg&e utility poloe. main/meter service panel corroded beyond repair. pge shutoff pwer and asked for replacement of msp
2381 41st AvSunset/Parksideissued#Electrical
Jan 23, 2019
No cost listed
Correction of address under ew201806193769. equipment located on utility pole on southwest corner of 46th ave. and rivera.
999 Unknowncomplete
Aug 6, 2018
No cost listed
#677: replace existing ac panel with new 200amp power protection cabinet. install new 1 1/4" emt with #2 feeders for rbs 6131 service upgrade.
669 Portola DrWest of Twin Peakscomplete#Electrical
Jun 19, 2018
No cost listed
Main / meter service panel corroded beyond repair, pge shutoff power and asked replacement of msp.
2201 46th AvSunset/Parksidecancelled#Electrical
Oct 4, 2017
No cost listed
Upgrade electrical service from 60a to 100a
222 Front StFinancial District/South Beachcomplete#Electrical