Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$38.1K
Most recent job
3mo ago
Jul 8, 2026
30 permits on record. Values are declared at filing.
Jul 8, 2026
$25K
Revision to pa# 202107073908 & 202605201657. remodel second floor bathroom in kind.
2132 16th AvWest of Twin Peaksissued
Jul 2, 2026
No cost listed
Revision to pa 202009013083 siding on front elevation of addition (under construction) to be replaced with stucco. drawing sheets revised a2.1, a3.1, a3.2 & details 1 & 2 a6.1
2132 16th AvWest of Twin Peaksissued
Jun 1, 2026
No cost listed
Bathroom remodel like for like existing second floor bathroom. ref#: 202605201657
2132 16th AvWest of Twin Peaksissued#Electrical
Jun 1, 2026
No cost listed
Bathroom retile like for like. existing second floor. no layout change ref 202605201657
2132 16th AvWest of Twin Peaksissued#Bathroom remodel#Plumbing
May 29, 2026
No cost listed
Add powder room and a bathroom remodel. one shower pan
466 Staples AvWest of Twin Peaksissued#Bathroom remodel#Plumbing
May 29, 2026
No cost listed
Bathroom remodel. add powder room
466 Staples AvWest of Twin Peaksissued#Electrical
May 20, 2026
No cost listed
To obtain final inspection for work approved under pa# 202107073908. all work is complete.
2132 16th AvWest of Twin Peaksissued
May 6, 2026
No cost listed
Third story addition to provide 2 bedrooms and bathroom over existing first floor living space and alteration of existing living space to provide stairway to new floor reference #202009013083, to provide electrical outlets and lights to additional bathroom & bedroom, no of lights 9, switches 3, receptacles 7, fans 1
2132 16th AvWest of Twin Peaksissued#Electrical
May 6, 2026
No cost listed
3rd story addition to provide 2 bedrooms and bathroom over existing living space and alteration of existing living space to provide stairway to new floor ref#202009013083, to provide new plumbing to bathroom addition
2132 16th AvWest of Twin Peaksissued#Bathroom remodel#Plumbing
Apr 27, 2026
No cost listed
Like for like bathroom remodel, shower valve
701 Pennsylvania AvPotrero Hillcomplete#Bathroom remodel#Plumbing
Apr 27, 2026
No cost listed
Like for like bathroom remodel, 2 lights, 3 switches, 2 receptacles, 1 fans
701 Pennsylvania AvPotrero Hillcomplete#Electrical
Apr 27, 2026
No cost listed
Like for like remodel, replace exhaust fan
701 Pennsylvania AvPotrero Hillcanceled#Plumbing
Apr 16, 2026
$28.2K
Unit#107: like to like bathroom remodel, 2nd floor unit 107. replace shower valve, tiles, vanity, recessed lighting, toilet, vanity light, paint
701 Pennsylvania AvPotrero Hillcomplete#Bathroom remodel
Feb 18, 2026
$48K
Build a powder room. like for like existing bathroom remodel
466 Staples AvWest of Twin Peaksissued#Bathroom remodel
Apr 21, 2025
No cost listed
Revision 202310188924 to correct the floor area.e/p 1st flr from 1042 sq ft to 1402 sf. total (exclude garage) e from 1042 to 1402. p from 2159 to 2520. total (include garage) e from 1.356 to 1716. p from 2354 to 2715. addition living area from 1.117 to 999. building coverage e/p frm 1,042 to 1,402
815 Joost AvWest of Twin Peakscomplete
Apr 1, 2025
$97K
Like for like kitchen and 2x bathroom remodel . drywall on second floor replace in kind. reroofing torch down. recessed lights and update main panel to 200 amps. replace (e) 6 windows vinyl to fiber glass windows; 1 of the windows facing street. remodel lower level wetbar.max u-factor 0.30.
2250 22nd AvSunset/Parksidecomplete#Windows#Roofing#Kitchen remodel#Bathroom remodel#Electrical
Apr 1, 2025
No cost listed
3x bathroom (replace shower (2)). 1 kitchen remodel & remodel lower basement wet bar. (2) shower pans. 1 tub. ref both pa#202502049648 & 202504013451.
2250 22nd AvSunset/Parksidecomplete#Bathroom remodel#Plumbing
Apr 1, 2025
No cost listed
Upgrade panel, add recessed lights bathroom, kitchen. (200 amps on panel.) ref both pa#202502049648 & 202504013451.
2250 22nd AvSunset/Parksidecomplete#Electrical
Feb 4, 2025
$100K
First floor convert storage into media room on ground floor to media room. 2nd floor relocate the skylight and infill light well. remodel bathroom.
2250 22nd AvSunset/Parksidecomplete#Windows#Bathroom remodel
Oct 4, 2024
No cost listed
Bathroom remodel, same layout same location, like for like.
120 Beaumont AvLone Mountain/USFcomplete#Electrical