Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$34K
Most recent job
4.1y ago
Sep 14, 2022
21 permits on record. Values are declared at filing.
Sep 14, 2022
$18K
Amendment for existing permit# 202207067876: downstairs bathroom w/ tub for existing 1 family dwelling.(legalize bathroom)
34 Keystone WyWest of Twin Peakscomplete#Bathroom remodel
Jul 6, 2022
$34K
In-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).
382 Madison StExcelsiorcomplete#Kitchen remodel#Bathroom remodel
Jul 6, 2022
$34K
In-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).
34 Keystone WyWest of Twin Peakscomplete#Kitchen remodel#Bathroom remodel
Jul 6, 2022
No cost listed
In-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).
382 Madison StExcelsiorcomplete#Bathroom remodel#Plumbing
Jul 6, 2022
No cost listed
In-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).
382 Madison StExcelsiorcomplete#Electrical
Jul 6, 2022
No cost listed
In-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).
34 Keystone WyWest of Twin Peaksissued#Electrical
Jul 6, 2022
No cost listed
In-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).
34 Keystone WyWest of Twin Peaksexpired#Bathroom remodel#Plumbing
Mar 3, 2022
$38K
In-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).
55 Burlwood DrWest of Twin Peakscomplete#Kitchen remodel#Bathroom remodel
Mar 2, 2022
No cost listed
In-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).
55 Burlwood DrWest of Twin Peakscomplete#Bathroom remodel#Plumbing
Mar 2, 2022
No cost listed
In-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).
55 Burlwood DrWest of Twin Peakscomplete#Electrical
Feb 9, 2022
$34K
In-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).
174 Hale StPortolacomplete#Kitchen remodel#Bathroom remodel
Feb 8, 2022
No cost listed
In-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).
174 Hale StPortolafiled#Bathroom remodel#Plumbing
Feb 8, 2022
No cost listed
In-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).
174 Hale StPortolacomplete#Electrical
Feb 8, 2022
No cost listed
In-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).
174 Hale StPortolafiled#Electrical
Feb 8, 2022
No cost listed
In-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).
174 Hale StPortolacomplete#Bathroom remodel#Plumbing
Nov 14, 2019
No cost listed
Installatin of (n) washer dryer, (n) circuit, (n) receptacle
23 A Delmar StHaight Ashburycomplete#Electrical
Nov 14, 2019
No cost listed
Installing a (n) washer dryer
23 A Delmar StHaight Ashburycomplete#Plumbing
Nov 14, 2019
$6.2K
Installation of new washer dryer stackable with new dedicated 220 v and 110 v 30 amp. new plumbing and carpentry required to close up and finish
23 A Delmar StHaight Ashburycomplete#Plumbing
Jun 8, 2017
$38K
Unit #3 new clothes w/d. removal of (e) kitchen to include cabinet replacement and removal of the wall btwn nd the living room. remodel the (e) 3 fixture bathroom. new electrical throughout the unit
875 Vermont StPotrero Hillcomplete#Kitchen remodel#Bathroom remodel
Jun 8, 2017
No cost listed
Install of new sub panel to supply power throughout the unit, 3 #3, 16x24, 10 lights, 8 switches, 33 receptacles, 13 circuits, 1 dishwasher, 1 garbage disposal, 1 microwave, 1 range, 4 smoke detectors
875 Vermont StPotrero Hillcomplete#Electrical