Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
2mo ago
Aug 4, 2026
51 permits on record. Values are declared at filing.
Aug 4, 2026
No cost listed
Work category: 2pa; extend drainage from existing main sewer stcak to new sink location, then extend gas line 5 feet for new location stove. then install new 50 gallons heat pump tank water heater, install new garbage disposal, kitchen faucet, and air gap for dishwasher.
1670 Cayuga AvOuter Missionissued#Plumbing#Water heater#Heating & cooling
Jun 15, 2026
No cost listed
Install proper vent for mop sink-p-tray-new drain for dishwasher, also install new floor sink and vent, replace grease trap
3781 Mission StBernal Heightscomplete#Plumbing
May 10, 2026
No cost listed
Work category: 2pa; note: extend drainage from existing main sewer to new sink location, then extend gas line 2 feet for new location stove. then replace mixing valve on the existing bathroom, new faucet and new toilet.
2539 44th AvSunset/Parksidecomplete#Bathroom remodel#Plumbing
Jan 26, 2026
No cost listed
Work category: 2pb; replace building trap underground distribution french drain storm drain system two powder room tree bathroom and master bathroom gas distribution one kitchen and laundry
1030 Leavenworth StNob Hillissued#Bathroom remodel#Plumbing
Jul 21, 2025
No cost listed
Work category: 2pb; note: extend existing main drainage for new bathroom in first floor , bathtub , shower, toilet and sink only.
31 Romain StTwin Peakscomplete#Bathroom remodel#Plumbing
Jul 17, 2025
No cost listed
Work category: 2pa; garage new tackle water heater ,steam unit and dwv distribution for unit above first floor new powder room kitchen sink ice maker third floor new bathroom with shower new bathroom with bathtub four floor main master bathroom with standing bathtub roof two roof drain with overflow for deck above connected to existing drain line also all new dwv will be reconnected and distributed to existing drains line above garage floor
62 Dolores TrMissioncomplete#Bathroom remodel#Plumbing#Water heater
Jul 2, 2025
No cost listed
Work category: 2pb; note building trap replacement underground distribution first floor one bathroom one laundry second floor one kitchen and one powder room third floor 2 bathroom. dwv distribution gas and water. storm rain system
237 04th AvInner Richmondcomplete#Bathroom remodel#Plumbing
May 19, 2025
No cost listed
Work category: 2pa; note: install new fixtures for hotel suit bath, for two showers and one bathtub. also adjust and relocate drains. install new toilet, new wall mounts faucets for double sink. laundry room: new drainage and vent for new toilet . existing drain for laundry to remain install new laundry box. also new fixtures for bathroom and two wall mount faucets.
1216 Folsom StSouth of Marketcomplete#Bathroom remodel#Plumbing
May 12, 2025
No cost listed
Work category: 2pa; note: new drainage and vent for new powder room ,extend drainage and vent to relocate toilet , shower drain drainage for will as a it is. new laundry, kitchen: drainage for kitchen island will remain, extend vents to new location. upgrade fixtures. gas for stove will remain as a it is, only extend gas for laundry for dryer.
734 A Ashbury StHaight Ashburycomplete#Bathroom remodel#Plumbing
May 12, 2025
No cost listed
Work category: 1p; note: upgrade kitchen ,extend drainage for new kitchen sink, also mixer valve for shower , upgrade new fixture for bathroom. relocate existing shower drainage.
1435 Lyon StPresidio Heightscomplete#Bathroom remodel#Plumbing
May 5, 2025
No cost listed
Work category: 1p; note: extend existing drain for laundry, upgrade hot and cold water lines for, kitchen drain will remain as it is. new fixtures for kitchen sink.
63 Walter StCastro/Upper Marketexpired#Plumbing
Feb 24, 2025
No cost listed
Work category: 2pb; building trap replacement, also extend sewer line up to 25 feet from curb street only.
182 Flood AvWest of Twin Peakscomplete#Plumbing
Nov 11, 2024
No cost listed
Work category: 2pa; note: replace mixing valve and shower head ; also water proof and test for shower only.
566 Lombard StNorth Beachcomplete#Bathroom remodel#Plumbing
Nov 10, 2024
No cost listed
Work category: 2pb; note: catch basin installation and sump pump installation.
377 Clipper StNoe Valleycomplete#Plumbing
Oct 7, 2024
No cost listed
Work category: 2pb; note: old clay pipe and building trap replacement about 6 feet from side walk, installation of vent for building trap.
589 Congo StWest of Twin Peakscomplete#Plumbing
Oct 2, 2024
No cost listed
Work category: 2pa; note: upgrade drainage for kitchen sink in new location, reconnect new vent to existing vent about ceiling height also upgrade hot and cold water lines, and extended to new sink location also install and ice maker for fridge.
741 Ashbury StHaight Ashburycomplete#Plumbing
Aug 15, 2024
No cost listed
Work category: 1p; note: install new 18" dishwasher in existing cabinet space, add new hot water shut off in existing line. install new air gap above sink, dishwasher will be discharge to existing kitchen sink p-trap.
238 Sadowa StOceanview/Merced/Inglesidecomplete#Plumbing
Aug 7, 2024
No cost listed
Work category: 2pa; upgrade main stack, replace old galvanized drainage lines and vents with new cast iron. note: this is for exterior work performance only.
963 Sanchez StNoe Valleycomplete#Plumbing
Jul 10, 2024
No cost listed
Work category: 2pb; note: replace building trap, underground distribution, french drain, storm drain system. two powder rooms, two bathrooms and master bathroom, gas distribution, one kitchen and laundry.
1030 Leavenworth StNob Hillexpired#Bathroom remodel#Plumbing
Jun 24, 2024
No cost listed
Work category: 2pa; garage: new tankless water heater, steam unit. and dwv distribution for units above. first floor: new powder room kitchen sink , ice maker. third floor: new bathroom with shower, new bathroom with bathtub. four floor: main master bathroom with standing bathtub. roof: two roof drains with overflow for deck above ,connected to existing drain line. also all new dwv will be reconnected and distribuited to existing drains line above garage floor elevation.
62 Dolores TrMissionexpired#Bathroom remodel#Plumbing#Water heater