Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
5mo ago
May 7, 2026
24 permits on record. Values are declared at filing.
May 7, 2026
No cost listed
To correct #pw20260428484 for incorrect address: work category: 1p; replace plumbing fixtures due to flood damage. final inspection needed only.
618 48th AvOuter Richmondcomplete
May 5, 2026
No cost listed
Work category: 3pb; install (34) gas earthquake safety valves
1100 Sacramento StNob Hillcomplete#Plumbing
Apr 28, 2026
No cost listed
Work category: 1p; replace plumbing fixtures due to flood damage. final inspection needed only.
1590 48th AvSunset/Parksideissued
Mar 25, 2022
No cost listed
Rough in shower valve & shower pan drain. install new water lines and drain for sink, install ndw water lines for toilet, (1) shower pan.
1100 Sacramento StNob Hillcomplete#Bathroom remodel#Plumbing
Sep 28, 2021
No cost listed
Relocate waste, water, vent for kitchen sink location. install new refrigerator box. relocate gas line to new stove location. reconfigure waste, water, vent for master bath toilet, tub, shower, sinks.
3561 A Sacramento StPresidio Heightscomplete#Bathroom remodel#Plumbing
Mar 23, 2021
No cost listed
Renewal pp20191216996:same work scope
1025 Anza StInner Richmondexpired#Plumbing
Mar 13, 2020
No cost listed
Renewal for expired permit pp20180119054, for final inspection.
74 Brady StMissionexpired
Dec 15, 2019
No cost listed
Rough and trim new baths and kitchens
1025 Anza StInner Richmondexpired#Bathroom remodel#Plumbing
Nov 6, 2019
No cost listed
Ground floor 2 units - rough and trim plumbing for 2 kitchens, and 2 bathrooms that include toilet, lavy and shower pans
740 Rhode Island StPotrero Hillcomplete#Bathroom remodel#Plumbing
Oct 4, 2019
No cost listed
3/f: remove & replace (e) sink in mother's room and remove & replace insta-hot inside mothers room.
88 Stevenson StFinancial District/South Beachcomplete#Plumbing
Aug 28, 2018
No cost listed
Rough and trim out (3) toilets, (3) lavys, (1) shower pan, (2) tub/shower combo, (2) kitchens, and run gas lines to new space heaters.
200 Guerrero StMissioncomplete#Bathroom remodel#Plumbing
Aug 3, 2018
No cost listed
Replace shower valve and new drain, stub out new waste and water lines for bathroom sink, trim out bathroom in master, (1) shower pan.
5160 Diamond Heights BlNoe Valleyexpired#Bathroom remodel#Plumbing
May 16, 2018
No cost listed
Relocate kitchen sink, drain and fridge box, install new shower valves, one tub, and a shower drain.
720 Stockton StChinatowncomplete#Bathroom remodel#Plumbing
Mar 13, 2018
No cost listed
Add new powder room, ref pp20171211028.
65 Whitney StGlen Parkcomplete#Bathroom remodel#Plumbing
Jan 25, 2018
No cost listed
Bathroom remodel, install new toilet carrier, relocate lavy drain, vent and water, install new shower drain, and valve and trim out bathroom.
1751 Lyon StPresidio Heightscomplete#Bathroom remodel#Plumbing
Jan 18, 2018
No cost listed
Relocate washer and gas dryer, relocate water line to refrigerator, move gas line for stove, reconfigure master bath fixtures and downstairs bath, trim out kitchen and powder room, add (2) bathrooms, (2) shower pans.
74 Brady StMissionexpired#Bathroom remodel#Plumbing
Dec 10, 2017
No cost listed
Rough in and trim out new kitchen sink, refer box, and 3" gas line to stove.
65 Whitney StGlen Parkexpired#Plumbing
Sep 28, 2017
No cost listed
Install new refrigerator box & extend gas line 2ft for cooktop.
337 Capistrano AvOuter Missioncomplete#Plumbing
Jul 20, 2017
No cost listed
Amend pp20170509200. original scope of work: reconfigure master bathroom. relocate washer and dryer. swap out tub to shower in downstairs hallway bathroom. install trim. add'l scope of work: gas line to upstairs firepit, replacing shower drain and valve in lower bathroom, relocate refridgerator box in kitchen
374 Douglass StTwin Peaksexpired#Bathroom remodel#Plumbing
May 9, 2017
No cost listed
Reconfigure master bathroom. relocate washer and dryer. swap out tub to shower in downstairs hallway bathroom. install trim.
374 Douglass StTwin Peakscomplete#Bathroom remodel#Plumbing