Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
11mo ago
Nov 4, 2025
10 permits on record. Values are declared at filing.
Nov 4, 2025
No cost listed
Remove and replace main 800a disconnect and pge meter stacks (23) total with (1) 250a sub panel.
1144 Pine StNob Hillissued#Electrical
Jun 17, 2025
No cost listed
Install a new temp 400a meter main 120/208 v 3 phase, 4 wire approved by pg&e. acquire a green tag upon inspection after installation. install a new 600a 120/208 v 3 phase, 4 wire distribution panel, conduits with support racks to feed circuits as follows: (1) 250a, (1) 175a, (2) 150a, (3) 100a
1990 Lombard StMarinaissued
Jun 16, 2025
No cost listed
Install (1) new msb 800a 120/208v 3 phase and (2) meter stacks (40) meters within a new utility room with 2 hr fire rated walls.
2090 BroadwayPacific Heightsissued#Electrical
Sep 13, 2024
No cost listed
Replace original building cloth wiring with new wiring, adding a ground to each apartment panel. replace fuse apartments with fuse panels.
2090 BroadwayPacific Heightsissued#Electrical
Jan 23, 2024
No cost listed
Supply and install: 1. (3) 225a panels to replace original fused panels (2) for the utility meters for apartment feeders and (1) for house loads.
2090 BroadwayPacific Heightscomplete#Electrical
Sep 26, 2019
No cost listed
Main switchboard: r/r main switchgear and metering - install 3000a 120/208 3/0 service, 3000a, 2-1600a & 1-1600a temp feeder; 1-600a & 1-125a paneboards.
1800 Pacific AvPacific Heightscomplete#Electrical
Jul 2, 2019
No cost listed
Remove & replace existing gen-set with the same size gen-set in the same location. replace breaker panel with same size & rating. (1) 600a panel, 500 mcm * 40' * 16 conductors.
353 Sacramento StFinancial District/South Beachcomplete#Electrical
Jul 2, 2019
No cost listed
Replace existing fuel day tank (single wall) with new double wall day tank, 100 gallon. in same location
353 Sacramento StFinancial District/South Beachexpired#Plumbing
Dec 5, 2018
No cost listed
Provide temp panels to power up a failed section in the switchboard. (1) 400a w ith (16) 100a breakers feeding utility meters
1800 Pacific AvPacific Heightscomplete#Electrical
Nov 19, 2018
No cost listed
Install solar power system. 144 pv modules, 365 watts per module, 52.56 dc kw rating. plan # 1933.
2001 Union StMarinacomplete#Solar & batteries