Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$359.3K
Most recent job
1.2y ago
Aug 20, 2025
10 permits on record. Values are declared at filing.
Aug 20, 2025
No cost listed
Amendment in ref to pp20250214602. for unit 2468: replace drain waste and water lines, water heaters, shower pan.
2468 Filbert StMarinaexpired#Bathroom remodel#Plumbing#Water heater
Feb 13, 2025
No cost listed
Renew permit# pp20230504784. 1 kitchen & 1 bathroom. new updated plumbing water line. shower pan.
2470 Filbert StMarinaexpired
Feb 13, 2025
No cost listed
Renew e202305046629. work at 2470 only.
2470 Filbert StMarinaissued#Electrical
Aug 13, 2024
No cost listed
Rev 202312223026 for revised guardrails at rear decks. see pa 202312223026 for structural details.
2468 Filbert StMarinaissued#Decks & stairs
Dec 22, 2023
$545.5K
Front and rear facade work, west property line windows replacement, new roof terrace, window replacement throughout, new hvac and water heaters; interior renovation replacing interior finihes throughout with minimal interior layout changes. deferred: fire sprinklers for top unit (levels 3-4)
2468 Filbert StMarinaissued#Windows#Roofing#Water heater#Heating & cooling#Siding & facade#Fire sprinklers & alarms
May 4, 2023
No cost listed
Work @ 2470 only. new rewiring - sub panel. 30 lights, 40 switches, 40 receptacles, 2 fans, 1 dishwasher. 1 garbage disposal, 1 microwave, 1 range, 6 smoke detectors.
2470 Filbert StMarinaissued#Electrical
May 4, 2023
No cost listed
Work @ 2470 only. new sewer line on water line, 1 bath. shower pan. 1 kitchen.
2470 Filbert StMarinaexpired#Bathroom remodel#Plumbing
Apr 27, 2023
No cost listed
(4) bathroom remodels, (2) in each unit, replace plumbing lines, drywall, insulating, (4) shower pans; 2 kit remodels, 1 in each unit. new water lines and waste lines.
2468 Filbert StMarinaexpired#Bathroom remodel#Plumbing
Apr 27, 2023
No cost listed
Rewire of 3/f unit, new outlets/lights/swithces, 30 lights, 30 switches, 50 receptacles, and subpanel. 4 fans, 1 d/w, 1 g/d, 1 microwave, 1 range, 8 s/d
2468 Filbert StMarinaissued#Electrical
Mar 30, 2023
$173K
Rewire of 3/f unit, new outlets/lights/swithces, new panel boards & add car charger in garage; (4) bathroom remodels, (2) in each unit, replace plumbing lines, drywall, insulating, (4) shower pans; 2 kit remodels, 1 in each unit
2468 Filbert StMarinaissued#Bathroom remodel#Electrical#Plumbing#EV charger