Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
1mo ago
Aug 27, 2026
23 permits on record. Values are declared at filing.
Aug 27, 2026
No cost listed
Run new dedicated line 240v, 50/50 amps for stove.
472 12th AvInner Richmondcomplete#Electrical
Aug 27, 2026
No cost listed
Run new dedicated line 240v, 50/50 amps, ev car
470 12th AvInner Richmondcomplete#Electrical
Aug 11, 2026
No cost listed
Run new dedicated line for car charger 50 amps 240 volt
2123 Funston AvWest of Twin Peakscomplete#EV charger
Aug 7, 2026
No cost listed
Run new dedicated line 240 volt, 30 amps two pole breaker.
188 South ParkFinancial District/South Beachcomplete#Electrical
Jul 31, 2026
No cost listed
Use (e) 60 amp circuit, install new disconnect, run 1" pvc conduit, install new 30 amp/240 volt breaker.
340 Lombard StNorth Beachcomplete#Electrical
Jul 31, 2026
No cost listed
Remove and replace the (e) zinco electrical panel, 100 amp/240 volt; install new eaton electrical subpanel, 100 amp/240 volt; run new dedicated 20 amp/120 volt line to laundry.
2770 19th AvWest of Twin Peakscomplete#Electrical
Jul 10, 2026
No cost listed
Ev charger, run new dedicated line, 240 volts, 50 amps, hardwire, wire #6, two hot & ground.
351 17th AvOuter Richmondcomplete#EV charger
Jun 30, 2026
No cost listed
Top unit: subpanel replacements 100 amps, 240v
3816 19th StCastro/Upper Marketcomplete#Electrical
Jun 30, 2026
No cost listed
Bottom unit: subpanel replacement 100amps, 240v
3816 19th StCastro/Upper Marketcomplete#Electrical
Jun 10, 2026
No cost listed
Run new dedicated line 240 volt, 30/30 amps for dryer appliance.
35 Santa Rosa AvOuter Missionissued#Electrical
Jun 1, 2026
No cost listed
Add new subpanel rate 125 240v, 60a: run new dedicated line 240v, 40a, for suana heater. run line 120v, 20a for outdoor gfci.
2547 Diamond StGlen Parkissued#Electrical
May 15, 2026
No cost listed
Run new dedicated line from existing panel 240 volt, 50 amps breaker for sauna.
1672 Alabama StBernal Heightsissued#Electrical
May 12, 2026
No cost listed
Install (5) new dedicated line, 120 volt / 20 amps, from (e) panel, dishwasher, disposal, refrigerator, small cooler, bedroom.
136 27th StNoe Valleycomplete#Electrical
Apr 23, 2026
No cost listed
Run new dedicate line from existing panel for neat pump, 30 amps 240 volt and another new line 20 amps, 120 volt for gfci outlets.
348 Lombard StNorth Beachcomplete#Electrical
Apr 3, 2026
No cost listed
Install car charger telsa, point, install management load, install new breaker 50/50 amps, 240 volt
75 Knollview WyTwin Peakscomplete#EV charger
Jan 22, 2026
No cost listed
Run new dedicated line for the dryer: 30 amps 240 v. service panel upgrade 200 amps: upgrade from 100-200 amps.
35 Santa Rosa AvOuter Missioncomplete#Electrical
Dec 18, 2025
No cost listed
Run new dedicated line for stove. run new dedicated line for ev car.
1224 08th AvInner Sunsetcomplete#Electrical
Oct 6, 2025
No cost listed
New dedicate line 240 v for a car charger, 50 amp two pole breaker
584 Hill StNoe Valleycomplete#EV charger
Sep 25, 2025
No cost listed
Run new dedicated line 120 volt, 20 am[s for laundry room, washer
8400 Oceanview TrOceanview/Merced/Inglesidecomplete#Electrical
Aug 7, 2025
No cost listed
Replace panel and move out of closet and relocate. sub panel 125amps.
5084 A Diamond Heights BlNoe Valleycomplete#Electrical